Explanation: Total: 8 steps over 2 days (Day 1: 4 slots, Day 2: 4 slots). Steps: H, J, K, L, M, O, P, S. Constraints: J on Day 2. P in Morning. K and M simultaneous (2 slots). M, O before J. O before P (Morning) and S. M and O before J (Day 2) means M and O must be on Day 1 or Day 2 before J. K and M (2 slots) before J must be Day 1. O before J (Day 2) must be Day 1. Day 1 (4 slots) must contain K, M, O (3 slots). The remaining slot is H or L or P. O must be before P (Morning) and S. If P must be in the morning, and O is on Day 1, P could be Day 2 Morning. If P is Day 2 Morning, J (Day 2) must be Day 2 Afternoon (since J is after P and M and O). If J is Day 2 Afternoon, Day 2 slots used: P (Morning), J (Afternoon). 2 slots remain on Day 2. S must be after O (Day 1). S can be Day 2. Since 3 tasks (K, M, O) are mandatory for Day 1, and only 4 slots are available, there is one remaining slot for H, L, or P. S must be performed on Day 2 (as Day 1 is full). Therefore, S must be performed on the second day. S is the task that must be performed on the second day.